This multidisciplinary group was tasked with restoring the historical track alignments of the mine so that it may serve as a tourist attraction as well as a functional passenger railroad. The team conducted comprehensive topographic surveys, a redesign of the existing track and yard layout around the engine house, crossings between historic and present rail lines, a locomotive run around for maneuvering around passenger cars, and the design of several trestle bridges as part of the final deliverable.
Project Schedule:
January, 2011 to January, 2012
Project Category:
Status:
Complete